PG Asphalt Facility

Market Sector: Oil and Gas Refining
Location: Lloydminster, Alberta
This project involved detailed engineering, procurement and construction support for the installation of a $5M heavy oil and hydrocarbon product storage and bulk loading facility. The multi-discipline project was completely design utilizing 3D CAD modelling techniques.


Non Segregated Tailings Pilot Plant

Market Sector: Oil Sands – Mining & Extraction
Location: Fort McMurray, AB
The project involved the provision of EPC services for a Pilot Plant to test various technologies aimed at the Production of a Non Segregated Tailings stream by combining the coarse tailings from dewatered cyclone underflow and the thickener underflow. Technologies Used: Belt Filter for dewatering, Hydro-cyclones. Total installed cost of the project exceeded $11.0M.

Relocate Coarse Tailings Lines to Grade (Trains 1 & 2) Project

Market Sector: Oil Sands – Mining & Extraction
Location: Fort McMurray, AB
The Coarse Tailings pipeline routing was redesigned to be relocated from high on the pipe rack down to grade to allow for safe, cost effective tailings pipe rotations. This project included detailed engineering and construction and commissioning support. The project involved primarily the installation of Slurry Piping (Fedur clad overlay piping) and Magnetic Resonance Flow metering technology. The total installed cost of the project was $5.5M

Sulphur Recovery Units and Tail Gas Treatment Unit Project

Market Sector: Oil Sands - Upgrading
Location: Fort McMurray, AB
Provide detailed engineering services for a two train 320 TPD Sulphur Recovery Plant, including Tail Gas Treatment Unit, Selexol Plant and Amine Plant in grassroots facility. Technologies Used: Selexol Acid Gas Removal Process. The entire facility was modeled utilizing 3D CAD technology. Capital’s scope included detailed engineering, field engineering and commissioning, as well as construction inspection and Engineer of Record responsibilities. The total installed cost of this project was $190M.

Nonfemet ZPL Zinc Smelter

Market Sector: Mineral Processing- Zinc Refining
Location: Danxia Province, China
This project scope included the design of mechanical, piping and instrumentation for the construction of a Zinc Smelting facility using Pressure Leach technology.

The project involved the creation of a 3D model, piping and equipment layouts for review by the local Construction contractor. Capital’s design focused on the mechanical and controls systems pertinent to the 3-train proprietary Pressure Leach process.

When complete, the total installed cost of this facility is forecast to be in excess of $100M.

Thickener Overflow to Coarse Tailings Pumpboxes Project

Market Sector: Oil Sands – Mining & Extraction
Location: Fort McMurray, AB
This project required detailed design to tie into an existing water header from tailings thickeners, with two new pipelines to transfer excess water to CT pump boxes for mixing. The benefits included reduced water volumes discharged into the tailings pond, as well as reduced water supply requirements at the CT. The total installed cost of the project was $1.2M.

Reclamation Operations Facility

Market Sector: Industrial / Commercial Buildings
Location: Fort McMurray, AB
This multi-discilpine project involved the installation of a multi-building complex to house office, operations and maintenance personnel for an oilsands client.

Capital Engineering was contracted to produce civil, structural, mechanical and electrical drawings to support this expansion project.

When complete, the total installed cost of this facility is forecast to be in excess of $10M.



Laboratory Expansion

Market Sector: Industrial / Commercial Buildings
Location: Fort McMurray, AB
This multi-discipline project involved the renovation and expansion of an industrial laboratory facility. Requirements included architectural design, modifications to the facility HVAC and mechanical systems, as well as installation of upgraded electrical utility supply and distribution.

When complete, the total installed cost of this project is forecast to be in excess of $2M.

Truck Shop and Wash Bay Facility Addition

Market Sector: Industrial / Commercial Buildings
Location: Fort McMurray, AB
This multi-discipline project involved the renovation and expansion of an industrial heavy hauler maintenance and washing facility.

Design modifications were required to ensure that the existing building met all applicable codes and standards. The second phase of the project included a building expansion to include office space and lunch room facilities.

Voyageur Coke Drum Facility

Market Sector: Industrial / Commercial Buildings
Location: Fort McMurray, AB
This project involved the design of the electrical power distribution, lighting, and fire alarm design to support the installation of a large-scale vessel fabrication facility.

Substation 6 Expansion

Market Sector: Electrical Substation Design / Industrial Buildings
Location: Fort McMurray, AB
This project involved the design and specification of a new substation to meet a client’s growing requirements for electrical power. The project was split into two main areas: design of the building and specification of the electrical MV and LV equipment. The building design included civil, structural foundation design, and mechanical and electrical building services. The electrical portion of the project involved a power system study, ARC flash analysis and relay coordination. Further responsibilities included specification of equipment and production of system drawings. When complete, the total installed cost of this facility is forecast to be $15M.

Cooling Plant Expansion

Market Sector: Electrical Substation Design / Industrial Buildings
Location: Edmonton, AB
This project was divided in to two distinct phases that saw the replacement of existing 13.8kV and 4.16kV switchgear and MCC line-ups. New equipment included the installation of 1.5 MVA dry type transformer plus rerouting of cable and cable trays to supply power to new and existing loads. This work included a full suite of power system analysis, including load flow, short circuit, protective relay coordination and ARC flash studies.



Cooling Plant Chiller Addition

Market Sector: Industrial Utilities
Location: Edmonton, AB
Work for this project included the installation of two new 3500 HP chillers to increase the capacity of the existing plant. The project included mechanical, piping, structural and instrumentation design to tie in the new equipment. The project challenges involved placing the equipment and piping in areas of a congested facility.



Vapor Recovery Skids

Market Sector: Gas Processing / Vapor Recovery
Location: Edmonton, AB
Capital completed multi-discipline detailed engineering for a series of vapour recovery gas compression skids in conjunction with a fabricator. The skids ranged in size and cost up to over $1M, and were installed throughout Alberta and in numerous international locations.



RC-5 Expansion

Market Sector: Industrial Utilities/ Commercial Buildings
Location: Fort Saskatchewan, AB
This project involved a major expansion to a pharmaceutical manufacturing facility. Capital Engineering was part of an integrated design team; the scope included architectural, structural, mechanical, HVAC, electrical, as well as design of security and fire alarm systems. Capital Engineering is the engineer of record for this facility. Further expansions and tie-ins o the existing chilled water (glycol) were also completed. The total installed cost of the project was $15M

Borealis Camp Potable Water Distribution System

Market Sector: Commerical Industrial / Waterworks
Location: Fort McMurray, AB
This EPCM project saw the replacement of the potable water distribution system to numerous facilities including a 2000 person camp facility. The mutli-discipline scope included all phases of engineering from scoping study to detailed engineering. Responsibilities included cost estimation, commissioning support and full time on site construction management services. The project was delivered within schedule and budget. The overall TIC of this project was $5.8M.

Coke Cutting Cabs Replacement

Market Sector: Oil Sands - Upgrading
Location: Fort McMurray, AB
To increase operator safety and improve ergonomics, this scope of this project was to redesign the operator control cabins, used during operation of the cokers. This project required that numerous initiatives regarding operator safety and comfort were met, while addressing significant challenges due to existing interferences of adjacent equipment and piping. The project design also had to be able to be installed during a short shutdown timeframe. When complete, the total installed cost of this project is forecast to be $4M.

Coke Bottom Head Ventilation

Market Sector: Oil Sands - Upgrading
Location: Fort McMurray, AB
This project involved the mitigation of the safety and operational hazards posed by large amounts of steam and heat released during operation of the cokers. The scope included the provision of a high capacity ventilation system that would allow for increased safety and visibility. When complete, the total cost of this project is forecast to be $1.5M.



HVGO Equipment Flushing

Market Sector: Oil Sands - Upgrading
Location: Fort McMurray, AB
This project involved the design and installation of an HVGO flushing system to remove heavy oil and asphaltene deposits in process equipment. The work involved multi-discipline engineering to upgrade the existing flushing system. Major equipment specified included heat exchangers, storage tank, pumps and associated piping systems.

Final Tailings Pumphouse (FTPH) Tailings Lines Relocation Project

Market Sector: Oil Sands - Mining & Extraction
Location: Fort McMurray, AB
Description: Provide detailed engineering services to modify the routing of each of the 20”, 24” and 30” tailings line that exit the FTPH. Many bottlenecks existed with the line cross-overs that affected maintenance and operation of the tailings systems. Total installed cost of the project was approximately $3.0M.